abutment pier

英 [əˈbʌtmənt pɪə(r)] 美 [əˈbʌtmənt pɪr]

网络  边墩

机械



双语例句

  1. By on-the-spot investigation, we find the non-shrinkage concrete above the abutment back-walls have more cracks than those in the pier joints.
    就现场调查结果发现,桥台背墙上方之无收缩混凝土发生龟裂现象,明显高于桥墩处伸缩缝。
  2. Abutment cracks appeared respectively in the construction period of Huanren and Hunanzhen single supporting pier solid-head buttress dams, which were treated once.
    桓仁和湖南镇两座单支墩大头坝在施工期均出现一些劈头裂缝,经工程处理后一直安全运行。
  3. According to the structural characteristics of the large abutment pier of a project, i.e. large-span, variable ramp and low elevation, the formwork was designed in inverse-hanged supporting structural type, resulting in good construction effect.
    结合某项目大跨度、变坡道、低高程的大墩台结构特点,采用反吊支撑结构形式进行模板设计,取得了良好的施工效果。
  4. The non-uniform settlement between the abutment and the pier on right bank resulted in the damage to the location-limited plate on right bank abutment, which has been treated in accordance with designer's requirements.
    由于右岸桥台基础与其它桥墩、桥台之间产生不均匀沉陷,使右岩桥台支座限位板破坏,后按设计要求进行了调整处理。
  5. Explosive Demolition of Underwater Abutment of Gravity Type Bridge Pier
    重力式桥墩水中承台的爆破拆除
  6. The girder, abutment and pier as well as the loads of high-speed railway bridges are of strong spatial mechanics characteristics, the plane mechanics calculation model cannot reflect these conditions effectively, and has its limitations.
    高速铁路桥梁、墩台及荷载均具有很强的空间力学特性,平面力学模型不能很好反映上述工况,有着较大的局限性。
  7. In bridge construction, the major task of survey lies in the accurate setting out of abutment location, pier location, and the components of the crossing structure.
    在桥梁建设中,测量工作的主要任务是精确地放样桥墩桥台的位置和跨越结构的各个部分。
  8. For the arch dam of Xianju Hydropower Station in Zhejiang Province, the mountain body of the abutment on the left bank is quite thick with the emergence of weak intercalated layers at higher elevation; therefore, the thrust pier with enlarged base is adopted.
    浙江省仙居水电站拱坝左岸坝头山体较雄厚,且软弱夹层出露的高程较高,故采用扩大基础的推力墩结构。
  9. Building a temporary pier between 0# abutment and 1# pier as the transition pier when building up guide girder and pushing the box girder.
    在0台和1墩设临时支墩,作为拼装导梁和箱梁顶推的过渡墩。
  10. New Technique for an Large size Abutment Pier with High Level Piles
    大型高桩墩台施工新工艺
  11. By virtue of an aid station based on the abutment central pile," comprehensive formulas for the layout of curves "is used to calculate the crossing angles of every pier or abutment.
    以桥头控制桩为基准设立辅助测站,用《曲线测设综合公式》求取在辅助测站上桥梁各墩台的交会角度。
  12. The practice proves that to arrange bridge pier in the direction along flow is one of effect way for solving water stop problem of multi line skew bridge abutment pier.
    实践证明顺水流方向布置桥墩是解决多线斜交桥墩台阻水问题的有效途径之一。
  13. Technology of temperature control with mass concrete for main abutment pier in Fengjie Changjiang Highway Bridge
    奉节长江公路大桥主墩承台大体积混凝土温控技术
  14. The temporary design criterion for computation additional longitudinal force between rail and abutment and pier on CWR bridge is still being studied at present in China, there are many items, which are deserved to discuss, one of them is the constant longitudinal resistance mechanics model.
    中国新建铁路桥上无缝线路设计及墩台顶纵向力计算暂行规定尚处于试行阶段,有些地方还很值得探讨,其中之一就是其常量阻力计算模型。
  15. Finally, travelling wave effect decreases the longitudinal seismic effect of the abutment pier and increases that of the other pier, but it is not noticeable influence on the lateral seismic effect.
    第三,行波效应减小了制动墩的纵向地震反应,增大了其它桥墩的纵向地震反应:对桥梁横向地震反应没有影响。
  16. Thoughts of Designing and Construction of Pile of Soft Soil Foundation Abutment and Bridge Pier Nearby
    对软土地基桥台和近台桥墩的桩基设计与施工的思考
  17. Through comprehensive analysis and check computations of the pile of No. 4 pier of a certain highway, this essay presents a tentative improving measures to the pile of soft soil foundation abutment and bridge pier in designing and construction.
    通过某高速公路A桥4墩桩基的综合分析与验算,对软土地基桥台和近台桥墩的桩基设计与施工提出了初步改进措施。
  18. Variable Ramp Large Abutment Pier Formwork Design for Ro/ Ro Vessels
    滚装船变坡道大墩台模板设计
  19. With the recent development rapid in port construction in China, some large size abutment pier with high level piles were built, including liquefied petroleum gas berths and oil berths.
    我国港口建设迅猛发展,近年来建设了一些大型高桩墩台结构的液化石油气码头、油码头。